Real-Time Bunkering Flow Rate & Estimated Time of Completion (ETC) Calculator

Maintaining precise control over transfer flow rates is critical for safe and compliant bunkering and cargo discharge operations under OCIMF and ISGOTT guidelines. This interactive tool provides chief officers and deck officers with instant telemetry on actual pumping performance (m3/h) using a standard 60-second flow meter delta test.

How to use:

  1. Enter the total nominated volume (Target Order QTY).

  2. Note the starting flow meter figure in Initial Meter Reading and trigger the Start 1 Min timer.

  3. When the acoustic alert sounds at 60 seconds, input the second figure into Final Meter Reading.

  4. The calculator automatically computes the actual transfer rate in $m^3/h$, remaining transfer volume, Time To Go (TTG), and accurate local Estimated Time of Completion (ETC).